Aga choses Ryan for fast-track schedule success
Aga Rangemaster Group is an international manufacturer of kitchen appliances. When the company decided its Cedar Rapids microwave manufacturing offices and plant needed to be consolidated, the company chose Ryan for its reputation for meeting aggressive construction schedules, and its ability to assist in the development and design process. The design solution was a two-part building. The 75,000-square-foot manufacturing plant is housed in a metal Butler building which contains loading docks, a pressroom, welding, assembly line and storage space. The remaining 17,000 square feet is a load-bearing masonry and steel building that houses an open office, a test kitchen and test labs.