Ryan responds to Alside Windows need for a fast-track project
Immediately upon deciding to locate their Southwest facility in Yuma, Arizona, Alside Window Company wanted to be open and operating by August 2005. That left a little over seven months to design and build the 222,554-square-foot facility. Ryan's design-build process met this very aggressive schedule with actual construction taking place over a 5.5-month period. The building is constructed with concrete tilt panels and has a joist/girder steel roof system. The majority of the structure is dedicated to manufacturing with 6,000 square feet serving as office space.

Alside Window Company

7500 East 30th Street
Yuma, AZ
Product Type: Industrial
Region: SouthWest
Date Completed: August 2005
Architect: Dickinson Architects