Papago Buttes 11
Papago Buttes Phase II

Papago Buttes Phase II

Papago Buttes Phase II

Extensive build-out process
Following Ryan's successful completion of the 280,000 square-foot Papago Buttes Phase I build-to-suit for Tosco Corporation (now ConocoPhillips), Ryan was selected to design-build the second phase of the project. This six-story 170,000 square-foot office building has an adjoining 1,000-car parking deck and features an outdoor atrium. The design and materials integrate the characteristics of the Phase I and Phase II buildings by utilizing pre-cast concrete panels and dark reflective glass. Innovative architectural design combined with landscape aesthetics A large outdoor atrium connection between the two buildings is designed for outdoor formal and informal gatherings. The outdoor atrium contains meandering sidewalks, streams and pedestrian bridges.

Papago Buttes Phase II

1500 North Priest Drive
Tempe, AZ
Southwest
Product Type: Office
Region: southwest
Size: 170,000 sq ft
Date Completed: November 2001
Architect: DFD CornoyerHedrick

Services Provided

  • Design-Build Design-Build
  • Design-Build Development
  • Financing Capital Markets
  • Construction Construction